Installation and commissioning

 1, The machine is usually installed on the right end of the roll door (from the inside of the house to the outside of the door), if it needs to be installed on the left end, simply loosen the two screws of the pawl unloader at the top of the chain, flip 180 ° and reassemble, Button switch line white (on) blue (down) color swap.

 2, the installation should make the vertical chain down from the exit, when not satisfied can be loosen the four fastening screws in the middle of the body, rotating the shell ring ring to meet the requirements, and then tighten. Note: there must be no solid gap exists, otherwise it will affect the solenoid suction.

 3, When the chain is installed, the dip of the control chain is 5-10mm, and the center distance can be adjusted to tighten the screw so that the chain is tightened to meet the requirement of sag.

 4, commissioning: test machine should first loosen the stopper locking screw, with the manual method will roll up or down to the limit point  limit screw to move the limit switch to the limit switch from power off Before you tighten the up and down locking screws respectively.

 5, first pull the ring by hand to make the door roll up about 1 meter from the ground, and then use the jogging method for load operation, and then adjust the appropriate operating conditions. Note that the running time does not exceed 5 minutes.

 6, three-phase roll door machine power phase sequence of installation is not allowed to reverse, or roll door machine can not control the damage roll door.

 7, Rolling door machine installation should be reliably grounded.